GM Service Manual Online
For 1990-2009 cars only

Removal Procedure

Tools Required

J 41507 Connecting Rod Assembly Guide

  1. Remove the oil pan. Refer to Oil Pan Replacement .
  2. Position the connecting rod to be serviced to Bottom Dead Center (BDC) by rotating the crankshaft.

  3. Object Number: 97787  Size: SH
  4. Remove the connecting rod cap bolts.
  5. Remove the connecting rod cap and lower connecting rod bearing.
  6. Important: Keep the bearings with the original connecting rod and cap. Do this in order to reassemble the connecting rod.

  7. Remove the lower connecting rod bearing from the connecting rod cap.

  8. Object Number: 406045  Size: SH
  9. Install the J 41507 to the connecting rod.
  10. Use the J 41507 , in order to push up the connecting rod and piston and access the upper connecting rod bearing.
  11. Remove the upper connecting rod bearing.
  12. Wipe the oil from the bearings.
  13. Inspect the connecting rod bearings. Refer to Crankshaft and Bearing Cleaning and Inspection .
  14. Measure the bearing clearance. Refer to Crankshaft and Bearing Cleaning and Inspection .

Installation Procedure

Tools Required

    • J 36660-A Electronic Torque Angle Meter
    • J 41507 Connecting Rod Assembly Guide

    Object Number: 406045  Size: SH

    Notice: Do not scrape, shim, or file bearing inserts. If the bearing surface of the insert is touched with bare fingers, the skin oil and acids will etch the bearing surface.

    Important: Make sure that the connecting rod cap bolt holes and the connecting rod cap mating surfaces are clean and dry.

  1. Dip the connecting rod cap bolts in clean engine oil.
  2. Use clean engine oil in order to lubricate the bearing surface.
  3. Install the upper connecting rod bearing.
  4. Use the J 41507 , in order to pull down the piston, connecting rod and upper connecting rod bearing.
  5. Remove the J 41507 .

  6. Object Number: 97787  Size: SH
  7. Install the lower connecting rod bearing to the connecting rod cap.
  8. Install the connecting rod cap.
  9. Notice: Use the correct fastener in the correct location. Replacement fasteners must be the correct part number for that application. Fasteners requiring replacement or fasteners requiring the use of thread locking compound or sealant are identified in the service procedure. Do not use paints, lubricants, or corrosion inhibitors on fasteners or fastener joint surfaces unless specified. These coatings affect fastener torque and joint clamping force and may damage the fastener. Use the correct tightening sequence and specifications when installing fasteners in order to avoid damage to parts and systems.

  10. Install the connecting rod cap bolts.
  11. Tighten
    Tighten the connecting rod cap bolts to 27 N·m (20 lb ft). Use the J 36660-A in order to rotate the connecting rod cap bolts an additional 50 degrees.

  12. Pry the connecting rod back and forth in order to check for binding. If necessary, loosen and then retighten the connecting rod cap bolts.

  13. Object Number: 35206  Size: SH
  14. Measure the connecting rod side clearance. Refer to Engine Mechanical Specifications .
  15. Install the oil pan. Refer to Oil Pan Replacement .