GM Service Manual Online
For 1990-2009 cars only
    • J 23327 Clutch Spring Compressor
    • J 41236 Coast Clutch Return Spring Compressor Adapter
    • J 41232 Direct Clutch Return Spring Compressor Adapter
    • J 36850 TRANSJELâ„¢
    • J 41234-1 Input Shaft Seal Installer Pusher
    • J 41234-2 Input Shaft Seal Installer Protector
    • J 41234-3 Input Shaft Seal Installer Sizer

    Object Number: 20279  Size: SH
  1. In order to aid in the assembly, lubricate the seal with transmission fluid.
  2. Assemble the coast clutch piston and seal assembly (504) into the input housing (502).
  3. Important: You must assemble the spring retainer with the inner lip facing up.

  4. Assemble the coast clutch release spring (505) and spring retainer (506) into the input housing (502).

  5. Object Number: 20268  Size: SH
  6. Compress the coast clutch return spring retainer (506). Use the J 41236 and J 23327 .
  7. Assemble the coast clutch spring retainer snap ring (507) onto the input housin (502).
  8. Remove the J 41236 and J 23327 .

  9. Object Number: 20267  Size: SH
  10. In order to aid in the assembly, lubricate the seal with transmission fluid.
  11. Assemble the direct clutch piston and seal assembly (518) into the input housing (502).
  12. Assemble the direct clutch return spring assembly (519) into the input housing with the snap ring retaining tabs facing up.

  13. Object Number: 20266  Size: SH
  14. Compress the direct clutch spring assembly. Use the J 41232 and J 23327 .
  15. Assemble the direct clutch snap ring (520) into the input housing (502).
  16. Remove the J 41232 and J 23327 .

  17. Object Number: 20265  Size: SH

    Important: Assemble the steel plates (508) with the splines in the input housing grooves that are machined to the pistons.

  18. Assemble the 4 steel coast clutch plates (508) and the 4 new fiber coast clutch plates (509) into the input housing in alternating order, beginning with a steel plate (508).

  19. Object Number: 20281  Size: SH
  20. Place the sprag outer race (512) on the bench with the flat side down and the side with the snap ring groove up.
  21. Place one end bearing (514) into the outer race.
  22. While rotating the sprag slowly, assemble the sprag clutch (515) into the sprag outer race. Keep the grooved edge up and the flat side down.
  23. Assemble the other end bearing (514) on top of the sprag clutch.
  24. Assemble the snap ring (516) into the sprag outer race (512) in order to retain the sprag clutch and end bearings.
  25. Important: The snap ring side of the assembly faces up when installing the sprag clutch onto the input sun gear shaft. The flat side of the sprag outer race functions as the backing plate for the coast clutch.

  26. While rotating the input sun gear shaft clockwise in order to help seat the sprags, assemble the sprag clutch and outer race assembly onto the input sun gear shaft (511).

  27. Object Number: 20283  Size: SH

    Important: The input sun gear shaft (511) must only rotate clockwise.

  28. Verify the correct operation of the sprag clutch by holding the sprag clutch outer race (512) and rotating the input sun gear shaft (511).

  29. Object Number: 20264  Size: SH
  30. Assemble the thrust bearing (510) on the underside of the input sun gear shaft.
  31. Retain the thrust bearing with J 36850 or equivalent.
  32. Assemble the input sun gear shaft and sprag clutch assembly (511 and 512) into the input housing. The splines on the input sun gear shaft engage with the coast clutch fiber plates.

  33. Object Number: 20261  Size: SH
  34. Assemble the steel (521) and new fiber  522) direct clutch plates into the input housing in alternating order beginning with a steel plate (521).
  35. Assemble the direct clutch backing plate (523) onto the input housing with the flat side down.
  36. Assemble the snap ring (517) in order to retain the input sun shaft and sprag clutch assembly and the direct clutch plates.

  37. Object Number: 20260  Size: SH
  38. Assemble the thrust bearing (524) on the top of the sprag clutch assembly. Retain with J 36850 or equivalent.
  39. Assemble the reaction carrier shaft and shell assembly (526) onto the input housing. The splines on the inside of the shell engage the direct clutch fiber plates.

  40. Object Number: 20259  Size: SH
  41. Assemble the thrust bearing (527) onto the top of the reaction carrier shaft and shell assembly.
  42. Assemble the reaction carrier sun gear and shell assembly (529) onto the reaction shaft shell.
  43. Important: Rotate the reaction carrier during assembly in order to mesh the sun gear with the pinion gears.

  44. Assemble the reaction carrier assembly (531) onto the reaction sun gear.

  45. Object Number: 20258  Size: SH
  46. Assemble the reaction carrier assembly to input sun gear thrust bearing (532) onto the reaction carrier assembly.
  47. Assemble the input sun gear (533) onto the input sun gear shaft.
  48. Assemble the input sun gear snap ring (534) onto the input sun gear shaft.

  49. Object Number: 20284  Size: SH

    Important: When assembling the four new Teflon seals (500) onto the input shaft, begin with the seal closest to the housing.

  50. Slide the J 41234-2 over the input shaft, and position the J 41234-2 at the seal groove closest to the housing. Coat the J 41234-2 with transmission fluid.
  51. Guide a new seal onto the J 41234-2 and slide the seal into the seal groove with the J 41234-1 .
  52. Repeat the above procedure for each seal. Adjust the J 41234-2 as necessary for each seal groove.

  53. Object Number: 20841  Size: SH
  54. Size the seals with the J 41234-3 .
  55. Leave the J 41234-3 in place for at least five minutes. If possible, leave the J 41234-3 in place until you install the assembly into the transmission case.